Artemis moon rocket fueling resumes after leak detection
Description
NASA has resumed liquid hydrogen flow for today's (Sept. 3) Artemis 1 moon rocket tanking. The team lost about 30 minutes during the pause to troubleshoot a fuel leak in the hydrogen supply line of the Space Launch System's core booster. Launch Preview: https://www.space.com/nasa-artemis-1-moon-mission-launch-preview
Fueling of both liquid hydrogen and liquid oxygen is continuing.
Credit: NASA
Commenting disabled.