U.S. Spacewalk 92 Animation
Description
An animation of U.S. Spacewalk 92 scheduled for Tuesday, July 2, when NASA astronauts will remove and replace a rate gyro assembly, which provides data on the orientation of the space station. Astronauts will then attach a support bracket, called a modification kit, in preparation for future installation of the orbiting laboratory’s International Space Station Roll-Out Solar Array on the 2A power channel on the port truss.
Join NASA as we go forward to the Moon and on to Mars -- discover the latest on Earth, the Solar System and beyond with a weekly update in your inbox.
Subscribe at: https://www.nasa.gov/subscribe
Commenting disabled.